English
  • English
  • Français
  • Español

SHACMAN 4X2 LNG Terminal Tractor in Singapore 2020

After a comprehensive one-year technical evaluation and configuration optimization process, SHACMAN successfully secured the prestigious bid in 2020 to supply 110 LNG-powered terminal tractors to PSA Singapore, a global leader in port operations. 

 

This landmark collaboration underscored SHACMAN’s engineering excellence and commitment to sustainable logistics solutions.

 

Building on the outstanding performance of the initial fleet, PSA Singapore placed a second order in 2021 for 50 additional SHACMAN LNG terminal tractors, further solidifying trust in SHACMAN’s cutting-edge technology and reliability. The entire second batch was successfully commissioned by November 30, 2021, seamlessly integrating into PSA’s high-efficiency port operations.

After a comprehensive one-year technical evaluation and configuration optimization process, SHACMAN successfully secured the prestigious bid in 2020 to supply 110 LNG-powered terminal tractors to PSA Singapore, a global leader in port operations. 

 

This landmark collaboration underscored SHACMAN’s engineering excellence and commitment to sustainable logistics solutions.

 

Building on the outstanding performance of the initial fleet, PSA Singapore placed a second order in 2021 for 50 additional SHACMAN LNG terminal tractors, further solidifying trust in SHACMAN’s cutting-edge technology and reliability. The entire second batch was successfully commissioned by November 30, 2021, seamlessly integrating into PSA’s high-efficiency port operations.

<< PREV:No more
>> NEXT:No more