After a comprehensive one-year technical evaluation and configuration optimization process, SHACMAN successfully secured the prestigious bid in 2020 to supply 110 LNG-powered terminal tractors to PSA Singapore, a global leader in port operations.
|
This landmark collaboration underscored SHACMAN’s engineering excellence and commitment to sustainable logistics solutions.
Building on the outstanding performance of the initial fleet, PSA Singapore placed a second order in 2021 for 50 additional SHACMAN LNG terminal tractors, further solidifying trust in SHACMAN’s cutting-edge technology and reliability. The entire second batch was successfully commissioned by November 30, 2021, seamlessly integrating into PSA’s high-efficiency port operations. |
![]() |
After a comprehensive one-year technical evaluation and configuration optimization process, SHACMAN successfully secured the prestigious bid in 2020 to supply 110 LNG-powered terminal tractors to PSA Singapore, a global leader in port operations.
|
This landmark collaboration underscored SHACMAN’s engineering excellence and commitment to sustainable logistics solutions.
Building on the outstanding performance of the initial fleet, PSA Singapore placed a second order in 2021 for 50 additional SHACMAN LNG terminal tractors, further solidifying trust in SHACMAN’s cutting-edge technology and reliability. The entire second batch was successfully commissioned by November 30, 2021, seamlessly integrating into PSA’s high-efficiency port operations. |
![]() |